Work done

The following is the reference list of projects and activities already done by CONTREG Sp. z o.o.:


1. Contract with Ansaldo Ross Hill, Houston, Texas USA – 06.12.95 – 10.06.97

Designing of Control System based on Allen Bradley PLC for Aluminum Plant to be completein Krasnoyarsk-Russia.

2. Contract with Energotechnika-Energorozruch S.A. Gliwice – 20.11.96 – 01.07.97

Commissioning of Distributed Control System TELEPERM XP from SIEMENS for BC50 fluidized bed boiler in Electro-Thermal Plant EC II Bielsko-Biała in Czechowice Dziedzice for the following areas:

  • fluidized bed boiler,
  • turbine set and auxiliary equipment,
  • water treatment station,
  • ashes and additives transport system.

3. Contract with ECOMEX S.C. Gliwice – 20.07.97 – 15.12.97

Complex designing, installation and commissioning for Control System for modernized Electro-Thermal Plant for Huta Cynku Miateczko Śląskie – OMRON PLC/FIX Intellution.

4. Contract with Energotechnika-Energorozruch, Gliwice 15.12.97 – 30.10.98
Contract with MOSTOSTAL ZABRZE S.A. 01.11.98 – 15.04.99

Supervising of MCP panels execution, installation, application software development, hardware and software commissioning (SIEMENS SICLIMAT X) for GM OPEL-site Gliwice for the following systems:

  • Compressed Air 6/12 Bar
  • Cooling Water System
  • Chilled Water System
  • Heating Ventilation & Air Conditioning Systems

5.Contract with Wetron GmbH 03.1999 – 07.1999

GM OPEL Gliwice – Paint Shop (all systems based on SIEMENS Simatic S7)Application software development and commissioning for:

  • Waste Water Treatment, Precleaning, Paint Sludge Removal;
  • participation in commissioning process of the following systems: VBH, KTL, PRIMER, BC, CC
  • Software development, commissioning and supervising for Conveyor Systems

6. Contract with Huta Cynku Miasteczko Śląskie – 04.1998 – 09.1998

Complex designing, installation and commissioning for Control and Visualization Systemfor Sulphuric Acid Factory Miasteczko Śląskie – OMRON PLC/FIX Intellution

7. Contract with Daewoo-FSO Warszawa – 10.1998 – 03.1999

Complex designing, installation and commissioning for control system for cooling water plant in Body Shop – Daewoo-FSO Warszawa – Mitsubishi PLC

>>>> Check the gallery

8. Contract with Taskoprojekt Poznań 02.1999 – 10.1998

Turn Key installation for Control System for Slat Conveyor Body Shop in Daewoo-FSO Warszawa – Mitsubishi PLC

9. Contract with Wetron GmbH – 04.1999 – 08.1999

GM OPEL Gliwice – Paint Shop Phase II Application software development and commissioning for new Conveyor Systems, new Ovens (SIEMENS Simatic S7).

10. Contract with Wetron GmbH – 06.1999 – 12.1999

GM OPEL Thailand – Paint Shop (all systems based on SIEMENS Simatic S7) Application software development and commissioning for:

  • Waste Water Treatment, Precleaning, Paint Sludge Removal;
  • participation in commissioning process of the following systems: VBH, KTL, PRIMER, BC, CC

11. Contract with SIEMENS Landis & Staefa – 07.1999 – 07.2000

GM OPEL Gliwice SUB-S program Supervising of application software development, hardware and software commissioning (SIEMENS SICLIMAT X).

12. Contract with TASKOPROJEKT

Documantation designing with EPLAN 5.2, software preparing and commissioning of pinsmachine in Opel GM body shop with Simatic-S7 (SPS 315-DP) controller

>>>> Check the gallery

13. Contract with Wetron GmbH 06.2000 – 09.2000

Hanging transport system EHB commissioning and software modernization for conveyor system – Furdertechnik with Simatic-S5 (SPS 111U), VW Factory Bratislava, Slovakia.

14. Contract with SKS 06.2000 – 07.2000

Visualization preparation and commissioning of aluminium grinding tools with Simatic-S7(SPS 414-2DP).

15. Contract with SKS 08.2000 – 08.2000

Commissioning of regulation and transport system for the oven used to bake the ceramic semiconductor materials with Simatic-S7 – Deutschlandsberg – Austria

16. Contract with SKS

Software designing for -fast stop- function on BDC lifts (CS311 and CS411) in Opel GM Gliwice

17. Contract with Ecomex s.c. 09.2000 – 01.2001

Complex software designing and commissioning of boiler WR10 regulation system with GE-Fanuc controller and visualization of this process with SCADA – InTouch.

>>>> Check the gallery

18. Contract with ASI GmbH 09.2000 – 01.2001

Complex software designing and commissioning of Mercedes paint shop with Simatic-S7 (SPS 416-3DP) and visualization of this process with SCADA – InTouch and FMR in Victoria – Spain.

19. Contract with SKS 11.2000 – 02.2001

Supervising of electrical installation in Epcos – Zuhai – China.

20. Contract with SKS 11.2000 – 02.2001

Commissioning and modernization of transport system of the ceramic semiconductor materials for the oven D25, D23 – EPCOS – Deutschlandsberg – Austria.

21. Contract with SKS 01.2000 – 12.2001

Supervising of electrical installation in Mercedes paint shop – Victoria – Spain.

22. Contract with Wetron GmbH 02.2001 – 07.2001

Software designing and commissioning of hanging transport system for groups – FVWTRA72 and FVWPRO71+2 with Bosch controllers (SPS CL550) in Opel – Ruesselsheim – Germany.

23. Contract with SKS 05.2001 – 07.2001

Supervising of electrical installation in Epcos – Zuhai – China.

24. Contract with Rimsa 06.2001

Modernization of safety circuit for BDC CS411 in Opel GM – Gliwice with Simatic S7 (SP414-2DP).

25. Contract with Eisenmann 2001 – 2003

Complex software designing, commissioning, production support and signals data exchange with SCADA system in Scania paint shop (Conveyour- Process- and Ventilation- Systems) -Oskarshamn – Sweden with Allen-Bradley controllers (Control Logix 5550, configuration of industrial RS Networks ControlNet, DeviceNet and Ethernet,Profibus-DP and ASI-Bus)

>>>> Check the gallery

26. Contract with Wetron GmbH 08.2002 – 09.2002

Software designing and commissioning of the oven with Simatic-S7 controller in Opel GM – Thailand.

27. Contract with Energotechnika – Energorozruch – 10.2002 – 11.2002

Software designing and commissioning for safety devices on water pumps – condensers in power station -Kostolac-, Serbia. PLC GE-Fanuc Versa-Max, operators panel GE Data Panel 150.

>>>> Check the gallery

28. Contract with Comau GmbH – 11.2002 – 10.2003

VW Poznań – commissioning and production support (conveyors and KUKA robots on body framing -GEOBOX- station) with Simatic-S7 416 2DP

29. Contract with Energotechnika – Energorozruch – 03.2003 – 05.2003

Software designing for control system of ash blowers on boiler in paper plant Arctic Paper – Kostrzyn nad Odrą. GE-Fanuc PLC.

30. Contract with Wetron GmbH 16.06.2003 – 28.06.2003

Software designing for -Body Centre Station- Rosenheim for Hyundai Ulsan -Korea with Mitshubishi Q controller.

31. Contract with Nothelfer 11.2003 – 01.2004

VW Poznań – complex realization of electrical installation, software design and commissioning of an additional MIG welding KUKA robot system with a pneumatic sliding axis in body framing station (AFO 140) with Simatic-S7 416 2DP

>>>> Check the gallery

32. Contract with GPU 12.2003 – 03.2004

VW Poznań – Swarzędz – commissioning and production support for KUKA robots.

33. Contract with Wetron GmbH 05.2004 – 01.2005

Software designing and commissioning of logistic groups – Wheels, Cockpit, Seats, Axle and monorail hanging transport system for Door line. Participation in commissioning Chassis, Trim, Washing and Shipping groups and production control system PLUS using CLICK interface -Tuscaloosa- USA state Alabama with PLC Allen Bradley (Control Logix 5563, configuration of industrial RS Networks ControlNet, DeviceNet and Ethernet PILZ SafetyPLC)

>>>> Check the gallery

34. Contract with GM Opel Poland 12.2004 – 01.2005

Moving of auditing work deck to a new position. Simatic S7 PLC.

35. Contract with IPS Polska since 11.2005 – 01.2007

Software designing, commissioning and production support of first stage conveyors system (VBH, KTL, UBS) of a new Paintshop GM Zaragoza. PLC Allen Bradley (Control Logix 5563) with GM Global Standard – Saragossa, Spain.

36. Contract with RESA GmbH 02.2006 – 03.2006

Software commissioning of magnetic hanging transport system of body parts (Inductiv EHB Line) for Cowl Roof group on KIA Motors Press Shop. PLC Allen Bradley (Control Logix 5562) with operating panels PanelView 1500 – Zylina, Slovakia.

37. Contract with Blumenbecker Automatisierungstechnik GmbH od 04.2006 – 08.2006

Software designing, commissioning and production support in Kronospan MDF factory. PLC – Simatic-S7. Szczecinek, Poland.

38. Contract with Elektro Mack GmbH 08.2006-01.2007

VW Poznań – commissioning and production support in body framing station (AFO 140) for Caddy Maxi. Simatic-S7 416 2DP, KUKA and Phoenix Interbus. Poznań, Poland.

39. Contract with Blumenbecker Automatisierungstechnik GmbH 11.2006

OCP Khouribga – commissioning and production support phosphate wet mill . Allen-Bradley controllers (Control Logix 5550, RS Networks DeviceNet and Ethernet). Khouribga, Marocco.

40. Contract with SIEMENS AG Austria 05.2006- 08.2007

VW Poznań – Swarzędz – commissioning and production support manual stations for Caddy Maxi . Simatic-S7 416 2DP and Phoenix Interbus. Swarzędz, Poland.

41. Contract with SIEMENS AG Austria 11.2006- 03.2008

GM Gliwice – commissioning and production support for implement Astra III Sedan . Body shop area, PLC Simatic-S7, ProfiBus. Gliwice, Poland.

42. Contract with DÜRR Poland Sp z o.o 01.2007- 05.2007

The programming implementation and commissioning of the conveyor systems in the paint shop Iran Khodo, Mashhad, based on PLC Siemens S7-400 and Profibus net, Visu Suetron.

43. Contract with DÜRR Poland Sp z o.o 04.2007- 03.2008

The programming implementation and commissioning of the conveyor systems CC03, CC04 UBS and CC08 Spot Repair in the paint shop CP4 Chery Wuhu –China, based on PLC Siemens S7-400 and Profibus net.

44. Contract with PPT Taskoprojekt-Poznań 07.2007-09.2007

The programming and commissioning of the Right and Left wings welding station for VW CADDY in Body Shop of VW-Poznań in the scope as follows :

· 3 Robots KUKA

· PLC Siemens S7-400 and Profibus net

· WinCC Touch panel

· welding points WMS –Fase

45. Contract with CIEM MADA Poland Sp. z o.o 15.06.2007-30.11.2007

The programming implementation and commissioning of the conveyor systems and visu Skid No.1 FAP welding Shop Tychy. PLC Allen Bradley, packed PV1000 and DeviceNet.

46. The contract with Blumenbecker GmbH . period : 03.2008 – 12.2008

Based on , delivered technological descpriptions and E-plan documentation , the programing and commissioning of the PLC Simatic S-7 control and In-Touch v.9.5 visualizations systems , have been implemented in the “wet wood chopper” and “dried sawdust” technological area of the Gagarin Wooden Board factory in RUSSIAN FEDERATION under surveillance of f-a. DIEFFENBACHER as a main contractor.

47. The contract with KUKA SYSTEMS GmbH: 06.2008 – 12.2012

The programming and commissioning of the PLC Siemens S-7 and Allen-Bradley control systems alongside with implementation of WinCC , WinCC flexible visual control systems (in accordance with the GM Global Standard). for the “Framing 2” enterprise in the Body Shop technological area of GM-Opel car factory in Gliwice – Poland.

48. Contract with DÜRR Poland Sp z o.o 09.2007- 03.2008

Coordination of the software implementation (Rockwell India) PLC, Data PLC, Visualisation, of the conveyor systems for the paint shop TATA Lucknow, India, based on PLC Siemens Allen Bradley with Profibus, Visu PV1000, PV600.

49. The contract with Lubotech for Nothelfer – 06.2008-12.2011

The programming and commissioning Body Side Inner/Outer. PLC Allen Bradley with GM Global Standard. Opel Gliwice.

50.The contract with PPT Taskoprojekt – Poznan˝, 06 .2008 – 08.2008

The programming and start-up works connected with the replacement of the amount of 14 old KUKA robots with the same amount of the new ones ( type VKR 200 COMP.) on the underbody Caddy line in the Body Shop of VW-Poznan.

51. Contract with DÜRR Poland Sp z o.o 04.2009- 05.2009

Coordination of the commissioning (Rockwell India) PLC, Data PLC, Visualisation, of the conveyor systems for the paint shop TATA Lucknow, India, based on PLC Siemens Allen Bradley with Profibus, Visu PV1000, PV600.

52. Contract with PPT Taskoprojekt-Poznań 07.2009-08.2009

The programming and commissioning on the Right and Left wings welding station (continued p. 44) for new model VW CADDY GP in Body Shop of VW-Poznań in the scope as follows:

· 3 Robots KUKA

· PLC Siemens S7-400 and Profibus net

· WinCC Touch panel

· welding points WMS –Fase

53. Contract with Ciem-Mada Sp z o.o , 1/07/2010 -31/12/2010

Programming, commissioning and start-up works of the new general assambly line PPD6 in FAP-Tychy, based on Siemens S7 PLC, Profinet and WinCC Flexible visualization.

54. Contract with Ciem-Mada Sp z o.o. , 1/08/2010 -30/09/2010

Programming, commissioning and start-up works of lines 1,2,3 ‘Ferratura’ in Body Shop Area, FAP-Tychy, based on PLC AB Rockwell Automation, DeviceNet and RS View Faktory Talk visualization.

55. The contract with ThyssenKrupp, 01/10/2010 – 31/12/2011

The programming and commissioning Body Side Inner/Outer for Astra IV HB3/NB4. PLC Allen Bradley with GM Global Standard. Opel Gliwice.

56. The contract with ThyssenKrupp, 01/10/2010 – 31/12/2011

The programming and commissioning hemmings on Door, TailGate and Hood lines for Astra IV HB3/NB4. PLC Allen Bradley with GM Global Standard. Opel Gliwice.

57. Contract with Dürr Poland Sp z o.o., 1/11/2010 – 31/01/2012

Programming and commissioning of PLC control system, visualization and EMS identification system for skid transport in the new paint shop, SVW Nanjing – China based on Siemens S7 PLC, Profibus and WinCC Flexible visualization.

58. Contract with Dürr Poland Sp z o.o., 15/07/2011 – 01/03/2013

Programming and commissioning of PLC control system, visualization and EMS identification system for skid transport in the new paint shop, SVW Yizheng – China based on Siemens S7 PLC, Profibus and WinCC Flexible visualization.

59. The contract with TMS, 01/02/2012 – 31/12/2012.

Programming and commissioning of PLC control system and visualization for Framing 1/2 lines for Astra IV Cabrio. PLC Allen Bradley with GM Global Standard. Opel Gliwice.

60. Contract with ThyssenKrupp Krause, 1/11/2011 – 12/12/2012

Programming and commissioning of PLC control system, visualization and identification system Moby-I for the gear boxes complex mounting in Daimler-Rastatt assembly line. Based on Siemens S7 ver. 5.4 (Graph)with Profinet, Profibus communication and visu software WinCC Flexible and Transline for OP12.

61. The contract with ThyssenKrupp, 01/09/2012 – 01/12/2012

Assistance after commissioning and modification of the PLC system and visualization for welding SVW line Golf 7, Wolfsburg, Germany. The system is made on the basis of Siemens S7 and WinCC Flex Profinet.

62. Contract with Dürr Poland Sp z o.o., 01/08/2012 – 26/03/2014

Programming and commissioning of PLC control system for skid transport in the new paint shop, FAW Audi Changchun – China based on Siemens S7 PLC and Profibus.

>>>> Check the gallery

63. Contract with Dürr Poland Sp z o.o., 1/11/2012 – 27/07/2014

Programming and commissioning of PLC control system and visualization and for skid transport in the new paint shop, SVW Ningbo – China based on Siemens S7 PLC, Profinet and WinCC Flexible visualization.

64. Contract with Dürr Poland Sp z o.o., 1/08/2013 – 31/10/2014

Programming and commissioning of PLC control system and visualization and for skid transport in the new paint shop, SGM Wuhan – China based on Siemens S7 PLC, Profibus and TIA Portal visualization.

65. Contract with Dürr Poland Sp z o.o., 1/12/2013 – 02/2015

Programming and commissioning of PLC control system and visualization and for skid transport in the new paint shop, Beijing Benz Automotive Co – Beijing, China based on Siemens S7 PLC, Profinet and Daimler Integra visualization.

66. Contract with Blumenbecker IPS Polska, 06/2014 – 03/2015

The programming and commissioning of the PLC Siemens systems and ABB robot seeds for the welding stations of BMW Shenyang-China Body Shop.

>>>> Check the gallery

67. Contract with Blumenbecker IPS Polska, 06/2014 – 06/2015

Programming and commissioning of PLC systems Allen-Bradley robotic welding cell in the project GM Opel – Gliwice.

68. Contract with Ciem-Mada Sp z o.o., 15/01/2015 – 31/03/2015

Programming, commissioning and start-up works of the buffer lines for the skid transportation in Body Shop Area, FAP-Tychy, based on PLC AB Rockwell Automation, DeviceNet and RS View Factory Talk visualization, Balluff reading stations and safety PLC Pilz.

69. Contract with ABB Polska Sp. z o.o., 06/2015 – 08/2016

Software and commissioning robotic welding cell at Saferoad Pomerania Sp. z o. o. The work done on the basis of robots ABB IRB 2600ID, IRB6650S ABB, ABB positioner IRBP L-1000 and the press brake.

>>>> Check the gallery

70. Contract with ABB Polska Sp. z o.o., 07/2015 – 05/2016

Software and commissioning robotic module for grouping sachets at TEVA Polska. The work done on the basis of robots ABB IRB 360 Flex Picker and a programmable safety system PLC Pluto.

71. Contract with ABB Polska Sp. z o.o., 08/2015 – 12/2016

Software and commissioning robotic packaging line of cakes at TAGO Przedsiębiorstwo Przemysłu Cukierniczego Tadeusz Gołębiewski. The work done on the basis of PLC Siemens S-1200 and S-1500 in an environment of TIA Portal v13.

72. Contract with the company Dürr Polska Sp. z o.o. 11/2015 – 08/2016

Software and commissioning of the PLC system and visualization Allen Bradley of skid transport in Paintshop FCA Toluca – Mexico.

73. Contract with the company Dürr Polska Sp. o.o., 01/2016 – 10/2016

Software and commissioning of the control system PLC and visualization for transportation skid BDC on the connector of Paintshop and Bodyshop SGM Wuhan – China. work done on the basis of the control system Siemens S7 ver.5.5, Profinet network and TIA Portal visualization.

74. Contract with ABB Polska Sp. z o.o. 01/2016 – 08/2016

Software and commissioning target robotic handling: forging presses, bending machines, quenching tanks and annealing furnace at Andersen Steel Kutno, Poland. The work done on the basis of ABB IRB 4600 robots and programmable safety system PLC Pluto.

>>>> Check the gallery

75. Contract with the company Dürr Polska Sp. o.o., 01/2016 – 04/2018
Software programming and commissioning of the control system PLC and visualization of skids transportation in Paintshop SVW Ningbo – China. Work done on the basis of the control system Siemens S7 ver.5.5, Profinet network and WinCC flexible visualization.

76. Contract with the company Blumenbecker IPS Polska, 03/2016 – 09/2017
Software and commissioning of PLC Siemens systems for welding and handling robot cells in the project VW Pamplona Spain as standard VASS.

77. Contract with the company Blumenbecker IPS Polska, 03/2016 – 09/2017

Software and commissioning of PLC Siemens systems for welding and handling robot cells in the project VW Wrzesnia as standard VASS.

78. Contract with ABB Polska Sp. z o.o., 04/07/2016 – 29/07/2016

Software and commissioning of robotic line at Cosma Magna S.A. The work done on the basis of ABB IRB 6650S robots.

79. Contract with AKE Robotics Polska Sp. z o.o., 10/2016 – 02/2017

Software and commissioning of robotic seeds for the welding stations of Volvo Olofström – Sweden Body Shop.

80. Contract with the company Dürr Polska Sp. o.o., 12/2016 – 03/2018
Software programming and commissioning of the control system PLC and visualization of skids transportation in Paintshop FAW-Volkswagen Qingdao – China. Work done on the basis of the control system Siemens S7 ver.5.5, Profinet network and WinCC flexible visualization.

81. Contract with the company Dürr Polska Sp. o.o., 02/2017 – 02/2018
Programming and commissioning of PLC control system and visualization for skid transport in paint shop, Beijing Benz Automotive Co – Beijing, China. Work based on Siemens S7 PLC, Profinet and Daimler Integra visualization.

82. Contract with the company Lubo Tech Sp. z o.o. sp.k., 05/2017 – 11/2017
Design of control system and safety circuits, software and commissioning of ABB and Motoman robots as well as Omron PLC controllers in a robotic molding line for facade panels Stofix Poland Sp. z o.o. – Komorniki.

83. Contract with Dürr Polska Sp. z o.o., 03/2018 – 01/2019
Programming and commissioning of PLC control system and visualization for skid transport in paint shop Mercedes Benz Charleston (SC) – USA. Work based on Siemens S7 ver.5.5 PLC, Profinet and Daimler Integra visualization.

84. Contract with GPU GmbH, 25/05/2018 – 06/07/2018
Programming work on the Rockwell Automation RSLogix 5000 PLC control system and production maintenance in the Ford Saarlouis – Germany body shop.

85. Contract with Taskoprojekt S.A., 01/07/2018 – 01/09/2018
Online software and commissioning of robots in cells modifications of KUKA VKRC1 and VKRC2 robots at VW Hannover – Germany body shop in T5 standard.

86. Contract with EBZ Automation Engineering Sp. z o.o., 07/2018 – 01/2019
Programming and commissioning of PLC control systems for robotic cells in the Mercedes Tuscaloosa (AL) – USA body shop. Works made on the basis of the Siemens S7 ver.5.5 control system in the Profinet network and visualization in the Daimler Integra standard.

87. Contract with Dürr Polska Sp. z o.o., 07/2018 – 12/2018
Programming and commissioning of PLC control system and visualization for skid transport groups in paint shop BMW SLP – Mexico. Work based on Siemens S7 control system and TIA Portal environment.

88. Contract with Multipit Sp. z o.o. Sp. k., 09/2018 – 11/2019
Programming work on the Siemens S7 ver.5.5 control system for robotic cells in VW Zwickau – Germany body shop in standard VASS5.

89. Contract with Process Control Engineering Sp. z o.o., 04/11/2018 – 23/11/2018
Programming and commissioning of KUKA robotic cells in foundry of plant BMW Landshut – Germany.

90. Contract with Process Control Engineering Sp. z o.o., 04/11/2018 – 15/12/2018
Programming and commissioning of Siemens S7-300 control system for cockpit general assembly station in plant BMW Wackersdorf – Germany.

91. Contract with Process Automation Solutions GmbH – An ATS Company,  12/2018 – 12/2019
Programming and commissioning of Siemens S7 v5.5 control systems with robotic welding cells in VASS5 standard for body shop in plant VW Zwickau – Germany.

92. Contract with TDO, 05/2019 – 08/2019
Software modification and production assist of robotic welding and handling cells with PLC ControlLogix 5570 Safety, DeviceNet network and HMI TIA Portal WinCC flexible V13 in GM Global standard on plant Vauxhall Luton – Great Britain. 

93. Contract with AIUT Sp. z o.o., 10/2019 – 03/2020
Software and commissioning of robotic handling and batteries assembly cells on ABB IRC5 and PLC TIA Portal S7-1500 control systems on plant VW Brunswick – Germany. 

94. Contract with WICKERT Maschinenbau GmbH, 11/2019 – 01/2020
Commissioning of hydraulic presses and operator stations in carbon rims production department at DT Swiss Polska Sp. z o.o. Oborniki plant using Siemens S7-1500 control system and HMI TIA Portal.

95. Contract with Amister Sp. z o.o. Sp. k., 01/2020 – 06/2021
Software and commissioning of a robotic vision inspection cell and pipe leakage checking using the ABB IRC5 robot, PLC S7-1500 control and HMI TIA Portal at the Electrolux Siewierz – Poland plant.

96. Contract with Blumenbecker Engineering Polska Sp. z o.o., 05/2020 – 06/2020

Software and commissioning on the VW-Transporter Cockpit assembly line, EHB system, elevators, Schernhubtish SEW MoviFit/MoviPro in the PLC TIA Portal V15.1 and WinCC 7.5 environment at the VW Hannover plant – Germany.

97. Contract with TapCon, 06/2020 – 07/2020

Software and commissioning of operator stations for the production line of automotive components in the Beckhoff TwinCAT v3 environment for the GROB-WERKE GmbH & Co. KG Mindelheim – Germany.

98. Contract with TapCon, 06/2020 – 08/2020

TMS Polska sp. z o.o. Gliwice – software preparation and offline tests of a robotic cell in the VASS 5 and VASS 6 environment (PLC Siemens S7, HMI WinCC, TIA Portal). Final commissioning of the cell at VW Września – Poland.

99. Contract with Blumenbecker Engineering Polska Sp. z o.o., 07/2020 – 09/2020

Software and commissioning of robotic spot welding lines using KUKA robots in the VASS5 and VASS 6 standard at the VW Swarzędz – Poland plant.

100. Contract with Amister Sp. z o.o. Sp. k., 03/08/2020 – 05/2021
Modification of the transport system and commissioning of a glass vision inspection station using the Zeiss testing device and S7-400 control at the Guardian Częstochowa – Poland plant.

101. Contract with Run-Bit Sp.z.o.o Sp.k., 11/2020 04/2021

Start-up, production assistance of pipette production lines for the needs of the pharmaceutical industry Ritter GmbH Schwabmünchen plant – Germany. PLC S7-1500 control and HMI TIA Portal V16.

102. Contract with CIEM S.p.A., 12/2020 07/2021
Programming, commissioning, and production support of lines for the skid transportation CLX Gallery, TSF, TSF2 at the FCA Tychy Body Shop. GuardLogix 5580/ Studio 5000 v33.00/ FactoryTalk View v12/ Safety PLC Pilz/ SEW Movifit FC/ SEW Movimot/ RFID Balluff.

103. Contract with Run-Bit Sp.z.o.o Sp.k., 05/2021 08/2022
Software and commissioning of PLC control systems for robotic purposes of laying and arming electric cells in car body chassis in the Siemens TIA Portal environment. BMW Dingolfing – Germany.

104. Contract with Evocon Solution, 08/2021 – 11/2021
Optimization of PLC control systems Siemens TIA Portal for robotic cells for laying and arming electric betteries in the chassis of car bodies, VW Braunschweig – Germany.

105. Contract with Delta Automation Sp. z o.o., 11/2021 – 07/2022
Software modification, acceptance tests and commissioning of the PLC control system of robotic station for loading rolls into machine producing hygienic articles for the P&G Crailsheim plant – Germany. AllenBradley GuardLogix 5580 (Safety), Logix Studio 5000 environment, HMI FactoryTalk View v11 and robotics ABB IRB6700.

106. Contract with QT-Swiss Engineering Sp. z o.o., 11/2021 – 02/2022
Off-line software and commissioning of PLC control systems for UB / UG robotic cells at Audi AU40x Neckarsulm welding plant – Germany. Siemens S7, TIA Portal PLCs in the VASS 5 and 6 standard.

107. Contract with Blumenbecker Engineering Polska Sp. z o.o., 02/2022 – 03/2022
Commissioning and production assistance of PLC control systems for skid transport in the VW Emden general assembly shop – Germany. Siemens S7-1500, TIA Portal v16 PLCs in the VASS 6 standard.

108. Contract with CIEM S.p.A., 03/2022 – 11/2022
Programing and commissioning of magazine and trim line at FCA Tychy – Poland assembly shop. PLC Siemens S7-400, WinCC, Safety PLC Pilz, SEW Movifit & Movimot, interlocks with Comau robots.

109. Contract with MM Systems S.r.l., 04/2022 – 06/2022
Programing and commissioning of robotics spot welding cells at FCA Tychy – Poland body shop. GuardLogix 5580/ Logix Studio 5000 v33.00/ FactoryTalk View v12/ SEW MoviDrive.

110. Contract with Team MG Industry Service, 05/2022 – 09/2022
Software modification, virtual and on-line commissioning of PLC control systems for robotic cells at Audi AU40x Neckarsulm welding plant – Germany. Siemens S7-300 PLC controllers in the VASS 5 and S7-1500 in the VASS 6 standard.

111. Contract with Run-Bit Sp.z.o.o Sp.k., 09/2022 06/2023
Software and commissioning of PLC control systems for robotic purposes of laying of electric cells in car body chassis in the Siemens TIA Portal environment. BMW Leipzig – Germany.

112. Contract with Weldon Sp. z o.o., 11/2022 – pending
Design and modification of power distribution systems and control systems for the previously moved and assembled robotic welding cell at the Weldon Brzezówka – Poland plant. Electrical design in EPlan environment, S7-1200 PLC controller, ABB IRB6640 robots with Kemppi A7-MIG welding sources and PDS/KEB spindle tool, TIA Portal V15.1 WinCC Advanced visualization.

>>>> Check the gallery

113. Contract with Run-Bit Sp.z.o.o Sp.k., 12/2022 – pending
Off-line software and commissioning of PLC control systems for robotic handling cells for process transport of engine cylinders for the contractor Liebherr GmbH at the Cummins Inc. plant Whitakers – USA. AllenBradley GuardLogix 1756 controller (Safety), Logix Studio 5000 v32 environment, HMI FactoryTalk View v12.

114. Contract with Run-Bit Sp.z.o.o Sp.k., 12/2022 – pending
Off-line software and commissioning of PLC control systems for robotic handling cells for process transport of turbine blades for the contractor Liebherr GmbH at the Accelleron/Turbo Systems AG Baden – Switzerland plant. TIA Portal V16 environment with S7-1500 controller and HMI Lite visualization.

115. Contract with Run-Bit Sp.z.o.o Sp.k., 06/2023 – 07/2023
Online software programming for a robotic cell for handling elements for the production of firearms using the ABB IRB 4600 robot for the GFM GMBH Steyr – Austria plant.

116. Contract with PPHU Wanika Kamil Górski, 04/2023 – 07/2023
Design of the safety system, modification of the line for the production of bags, on-line commissioning at Wanika Siemianowice Śląskie – Poland plant. Electrical design in the EPlan environment, S7-1200 controller, SICK safety module, Vision V260 visualization.

117. Contract with Stellantis Polska Sp. z o.o., 14/08/2023 – 08/09/2023
On-line commissioning of the modernized panel transport line in hall G40 along with the launch of the safety system at the Stellantis Gliwice – Polska plant. Safety environment TIA Portal V15.1 with S7-1500 controller and HMI visualization. Line operation STEP 7 v5.6 environment with SIMATIC S7-400 controller.

118. Contract with Lubo Tech Sp. z o.o. Sp.k., 09/2023 – pending